Full refurbishments
Full refurbishments (whole-house or full flat renovations) are ideal when you want to modernise the layout, upgrade services, and finish the entire property to a consistent standard. We manage the project end-to-end—planning the sequence properly so work flows from strip-out and first fix through to second fix, decorating, and snagging.
What’s included
Strip-out and preparation: protection, removal of old fixtures/finishes, and making the site ready.
Structural and layout changes: opening up spaces and preparing for new kitchens/bathrooms where needed.
First fix services: plumbing/heating and electrical work completed before walls are closed and plastered.
Plastering, flooring, joinery and finishes: second fix installations (kitchen, bathroom, carpentry), then decorating and final detailing.
How we run the project
We begin with a survey to agree scope and priorities, then issue an itemised quotation and programme. A typical refurbishment follows a clear order—demolition/strip-out, structural work, first fix, plastering, second fix, then decorating and snagging—to reduce delays and avoid rework.
Get a quote
If you’re planning a full refurbishment in London, contact us to arrange a site visit. Share any drawings, inspiration photos, and your target finish level, and we’ll advise on budget, timeline, and the best way to phase the works.
07903854379 02074762770
© 2026. All rights reserved. Sharp Line Construction Ltd | Reg. Office: Chichester Close London E6 5QJ | Company number 08639916 | VAT Reg. No. 426893265
Contact


